The North Trimble Road Bridge over USR30 will be fully closed for 7 days beginning on September 11, 2024. Access to both on and off ramps will be maintained during the closure.
Traffic is advised to follow the attached detour during the closure.
The road is set to reopen: September 18, 2024.