Traffic Lane Proposal For US 30 Reconstruction Project Through Mansfield

A proposal has been made for the traffic plan for the US 30 Reconstruction project through Mansfield. ODOT says the contractor is proposing one lane of traffic instead of 2, between 309 and Fifth Ave, to allow for the westbound side to have all of its construction at once during the 2021 construction season. RichlandSource.com reports the project team is looking at the proposed changes. 


View Full Site